Showing posts with label IQA. Show all posts
Showing posts with label IQA. Show all posts

Monday, October 13, 2008

Common Questions during IQA

I've been doing alot of presentation on how to conduct IQA, sometimes old habit die hard, I tend to be technical with the jargons, so since my posting is derived from my presentation, I hope I can enlighten you with the audit methods.

When you come to the place to audit, introduce yourself and inform your auditee the reasons for the visit. DO not intimidate your auditee, auditee suppose to assist the auditee and not find faults on the audit site. (You should have with you, Quality Questionnaires and Quality plan)

Here's are more example on questions you may ask during your audit?
  1. Do you know what is the company quality policy? (make sure the policy is visually display)
  2. Do you know how to operate this machine? Can you show me how to conduct quality check/test?
  3. Where's the quality tools? (check if the tools have proper identification, calibrated & easy to access)
  4. Where is the SOP? (Check if the SOP has validation, updated and easy to understand)
  5. Do you go through any training? (check his training records to verify)
  6. Where are your checklist?
  7. How often do you check the item?
  8. If you are on day off, who take over your job as operator/QC checker?
  9. Who is the QMR?(we need to ensure quality is communicated throughout the organisation, from top down)
  10. other relevant questions.
Remember to cross reference with records or other employee to verify the answer.
Once the audit is done, thank the auditee and do share some improvement activities for the site too.

Friday, October 3, 2008

What about IQA reports?

How to write report?

A report proforma has been designed to help identify the areas which should be commented upon.

The full draft audit report will be circulated and will be confidential to the following people:

  • the Audit Team;

Once the full Audit team has confirmed the report, the report will be circulated to:

  • the Auditees, i.e. the owners of the process that has been audited. This will give them the opportunity to comment on the factual accuracy of the report.
  • the President
  • HOD or the responsible personnel for the audited area*
  • the manager responsible for the audited area (if not an Auditee)
  • the Auditors
  • Internal Quality Audit Committee

The audit report should:

  • document what occurred during the Audit visit
  • be congratulatory where appropriate
  • include examples of good practice
  • identify where procedures need to be written and followed
  • should encourage the Auditees to do better where appropriate
  • Always include specific objective evidence
  • Run NCR/CAF pass auditees before you present them formally.
  • Once you have written a NCR/CAF, ensure it is fair.
  • Do Not raise NCR/CARs on unsolvable problems.


The Head of department should be given the opportunity to respond to the contents of the report within 5 working days of receipt of the report.

How to Evaluate IQA Findings?

Evaluation of results/Audit Findings

Categorization of Non-Conformance: this is to allow an organization to priorities its correction and prevention efforts in an effective manner.

Major non-conformance

  • An element of the standard is not addressed. (e.g. No manual, no policy, no significant procedure manual)
  • An activity, which is in direct contravention of standard.
  • An activity, which is in direct contravention of a procedure and could have significant effect on product and service quality.

Minor Non-conformance

  • An isolated incident of a non-conformance with a system or procedural requirement with no direct consequential effect on product/service quality.
  • Trends of minor non-conformance could lead to major non-conformance if more than 3 incidents of the same deficiency are encountered.

Observation

  • Comments on the quality system with a view to improvement.

More about Internal Audit

Pre-Audit: Audit scope identify
The scope of an audit relates to what will actually be audited. It is the extent and range of a given audit and could include:
• Organizational process, activities an product.
• Organization units, departments and work environments
• Group of people
• Physical locations
• Documentation

Pre-Audit: Audit team selected
• Management responsibilities
• An auditor is a person qualified and competent to conduct audits. (Training,Independent, appropriate knowledge of activity being audited)

Pre-Audit: Initial Audit planning meeting
• Prior to the commencement of the audit, a range of information needs to be discussed and confirmed with the auditee.
• Factor to consider in initial contacts with auditee.
  • Objective, scope, criteria, feasibility
  • Availability, timing, Timetable.
  • Auditee Contacts, audit team, resource
  • Approach, documentation required.
  • Previous audit results, outstanding Non-conformance.

Audit Plan: Timetable
Factor to consider:
• Process and Activities sequences/complexity of process/product.
• Important of activity risk/need for competency
• Infrastructure and Organizational layout.
• Work start/finish times.
• Physical locations
• Employee numbers
• Documentation;Number of procedures/Relevance to ISO 9001
• Schedule meetings with auditee/audit team

Pre-Audit: Documentation submitted and circulated to audit team
  • Manual
  • Documented Procedure
  • Process maps
  • Previous NCR/CAF